
He was only on screen about one second, but knew we were able to recognize him because the raw footage was on the TV station website earlier in the evening.




while the other part of the crew drags off 200 ft of hose and has to be squirting water within 2 minutes of the start of the drill.
setup a portable pond, dump the water from the tanker into the pond, have the pumper drafting water from the tanker, pull off 200 ft of hose and be squirting water within 5 mins.

The class also had to raise a heavy 35 ft extension ladder...
then roll tarps around it to create a long water chute. It's only elevated a little bit in this picture, but would typically be used to create a path to remove water from a second or third floor fire.
Norris is glad he only has to go to class two days next week because all this is hard work.
Then you run up this flight of outside stairs and grab a sledge hammer and chop 25 times on a block of wood.
Then you run back down the stairs, pick up a hose line full of water and drag it 80 ft.
Then you open the nozzle and have to knock over the orange cone with the water.
Then you drop the hose and run up another set of outside stairs, pick up a "victim" (sometimes a dummy, sometimes one of your class mates) and drag them 80 ft.
When you've finished that, you're done except for the part where you either throw up, pass out, or lay helpless on the ground until your lungs stop screaming. Norris usually does the latter.


But good sense prevailed. He is now a member.






The next day, the group worked on the roof cutting simulator. It gives the trainees the feel for working on a pitched roof while operating a special roof-cutting chain saw to cut a hole in the roof. Its a lot harder than it looks when you're wearing 60-70 lbs of protective gear and breathing from an air pack. At least we couldn't fall very far if we got tired.